Fleet electrification feasibility
Know what fleet electrification will take — before the $50,000 study.
Estimate peak power, charger count and mix, utility service impact, and rough order-of-magnitude cost for electrifying your depot — directional, defensible, and traceable to assumptions you can inspect.
Directional, not a stamp
A screening estimate (±40%) — enough for a confident go / no-go, not a PE-stamped engineering study.
Fully traceable
Every number maps to a named assumption you can open and inspect. No hidden math.
About 10 minutes
Five plain-language steps. A non-engineer can finish on a Tuesday afternoon.
Every number you see is traceable to an assumption you can inspect. We won't pretend it's a final design — and we won't waste your time with a toy calculator. Built by BEV Ready.